A tunnel furnace is a continuous conveyor furnace in which parts travel through a fixed sequence of heated and cooled zones on a belt, chain or roller bed, instead of being loaded into a chamber as a batch. The part moves; the furnace does not cycle.

The short answer

A tunnel furnace is quoted by total length and bought by three different numbers: the heated length, the work-zone clearance, and the dwell time. Total length is a shipping and floor-space figure. Heated length decides how much of the travel actually does thermal work. Clearance — usually the height, not the belt width — decides the largest part that can pass. Dwell time, divided into the published zone length, fixes the belt speed and therefore the throughput. Get those three numbers and the machine is specified; skip them and you are comparing metres of steel. On top of that, in any belt-conveyor tunnel the belt alloy, not the heating element, sets the temperature ceiling, which is why belt tunnels cluster in the 700–1,150 °C band while batch vacuum furnaces reach 2,300 °C. This guide sets out what our published record supports, where our own two records disagree, and the arithmetic a buyer can run before requesting a quotation.

Key facts

  • ✓HuanYu's catalogue documents a mesh-belt continuous furnace, the WDL-100-WX, at 1,100 °C, 21 / 30 / 85 / 120 / 145 kW, work zones from 1,000 × 120 × 80 mm to 20,000 × 240 × 150 mm, nitrogen or mixed-gas protection, in six stages: feed, preheat, sinter, slow cool, water cool, discharge (catalogue pp.17–24).
  • ✓The website publishes the same family as a chain-belt, air-atmosphere machine at "800 / 700 °C configurations" (/products/tunnel-furnace-94/). The two records differ by 300–400 °C; both are reproduced in the inconsistency section below rather than quietly reconciled.
  • ✓Across the published work-zone range the length grows 20×, the width 2×, and the available power 6.9× — so power per metre of tunnel falls from 21 kW/m to 7.25 kW/m (derived). Long tunnels are not proportionally powered.
  • ✓Usable volume grows 75× (9.6 L → 720 L) while power grows 6.9×, so power per litre falls 10.9× from 2.19 to 0.20 kW/L (derived).
  • ✓Only two of the six named stages are heated. If the stages were of equal length, 33% of a 20 m tunnel would be at temperature — a 6.7 m heated length. The true fraction is configuration-specific, which is exactly why it must be asked for in writing.
  • ✓The binding constraint on part size is the work-zone height (80 → 150 mm), not the belt width. A part taller than the clearance cannot enter, however wide the belt is.
  • ✓HuanYu Technology Equipment: 60 product series, 500+ models, 10+ years, GB/T 19001-2016 / ISO 9001:2015 (certificate U25Q2SH8002817R3M).

What the words "tunnel furnace" actually cover

Five different conveyors are sold under one name, and they are not interchangeable. Buyers who compare them on temperature alone usually compare the one number that matters least.

Conveyor typeHow the load travelsPractical continuous bandWhere it fails first
Mesh belt

Woven wire belt, driven by rollers

~700–1,150 °C

Belt creep and stretch; belt life falls steeply above ~1,000 °C

Chain belt

Linked chain strands, often with cross rods

~700–1,000 °C

Pin wear, elongation, tracking drift

Roller hearth

Driven rollers, no belt

~900–1,200 °C

Roller bow, drive synchronisation, part bridging

Slat / plate

Hinged plates on chain

~200–900 °C

Hinge seizure, plate distortion

Pusher / walking beam

No conveyor — trays pushed in steps

~900–1,300 °C

Tray wear, push alignment, part displacement

(Bands above are general engineering ranges for the conveyor types, not HuanYu specifications; our own published continuous platform is the belt type.)

One naming note. HuanYu publishes the family as "Tunnel Furnaces" and the configuration as a "Chain belt tunnel furnace … continuous air atmosphere heat treatment pipeline equipment" (/products/tunnel-furnace-94/), while the catalogue's platform is a mesh-belt machine under nitrogen or mixed gas. A quotation that says "tunnel furnace" without naming the conveyor and the atmosphere has not yet said which machine it is.

The belt is the temperature ceiling

This is the single most useful fact about belt-conveyor furnaces, and it is almost never stated in a quotation.

In a batch vacuum furnace the temperature limit is set by the hot zone: graphite felt and a graphite element can run at 2,000–2,300 °C (catalogue pp.19–20 and p.32), and the chamber is water-cooled and sealed. In a belt tunnel the hottest continuous duty component is a moving metal belt that must also carry load, bend around drums, and survive tens of thousands of thermal cycles. That belt — not the element, not the insulation — becomes the limit.

This explains a pattern that otherwise looks arbitrary. Our own two records sit at 1,100 °C (catalogue, mesh belt, nitrogen) and 700–800 °C (website, chain belt, air). The gap is not an error in one document; it is two different belts in two different atmosphere envelopes. It also produces a fast sanity check on any quotation:

If a belt-conveyor tunnel furnace is offered above roughly 1,150 °C, ask three questions before discussing price — what alloy is the belt, what is its rated continuous service temperature, and what is its quoted life in hours at that temperature. Above that band the honest answers usually migrate to a roller hearth, a pusher furnace, or a batch vacuum furnace.

The corollary matters for buyers coming from batch equipment: a tunnel furnace is not a "continuous vacuum furnace". Our continuous platform runs under nitrogen or mixed gas at slightly above ambient pressure; the vacuum platforms in the same catalogue reach 6.67 × 10⁻³ Pa to 2 × 10⁻⁴ Pa. A process that genuinely needs 10⁻³ Pa needs a batch chamber or a load-lock, not a belt through an open curtain.

Six stages, two of them heated

The catalogue names the process sequence explicitly: feed, preheat, sinter, slow cool, water cool, discharge (pp.17–24). That sequence is the architecture of the machine, and it is where the heated-length question comes from.

StageThermal roleWhat it does to the partWhat to ask
Feed

None

Presentation, atmosphere curtain, belt entry

Entry curtain gas flow; part spacing control

Preheat

Heated

Removes moisture and binder volatiles slowly

Zone length; ramp rate limit; exhaust routing

Sinter / fire

Heated

The process step — densification, brazing, firing

Setpoint, uniformity across belt, element access

Slow cool

Cooling

Controlled cooling to avoid thermal shock

Cooling rate; whether it is controlled or passive

Water cool

Cooling

Forced cooling to a handling temperature

Coolant temperature vs dew point; jacket corrosion

Discharge

None

Exit curtain, part removal

Exit temperature at hand-off; oxidation at the door

Two of six stages are heated; two are cooled; two are transfer. The consequence is arithmetic: if the six stages were of equal length, the heated fraction of a 20 m tunnel would be 33% — 6.7 m at temperature out of 20 m of floor space — and of the 1 m unit, roughly 333 mm. Real machines do not divide equally; preheat and sinter are usually the longest stages and cooling is often longer than either, because cooling rate is harder to control than heating rate. The fraction is therefore a design output, not a constant.

Which is why "20 m tunnel furnace" is not a specification. The question to put in the RFQ is: what is the heated length, what is the length of each of the six stages, and what fraction of the quoted overall length is at temperature? A supplier who answers in metres is working from a drawing; one who answers in total length is quoting a shipping dimension.

Geometry: the height sets the part, not the width

The published work-zone range for the mesh-belt platform is 1,000 × 120 × 80 mm at the small end and 20,000 × 240 × 150 mm at the large end. Reading those as three independent numbers misses the point; they move together.

ParameterSmall endLarge endChange
Work-zone length

1,000 mm

20,000 mm

20.0×

Work-zone width

120 mm

240 mm

2.0×

Work-zone height (clearance)

80 mm

150 mm

1.9×

Usable volume

9.6 L

720 L

75×

Cross-section

9,600 mm²

36,000 mm²

3.75×

Length ÷ width

8.3

83.3

10×

Width ÷ height

1.50

1.60

flat

Side surface ÷ volume

41.7 /m

21.7 /m

1.9× lower

Power (paired smallest-to-smallest)

21 kW

145 kW

6.9×

Power per litre

2.19 kW/L

0.20 kW/L

10.9× lower

Power per metre of length

21 kW/m

7.25 kW/m

2.9× lower

(Volumes, areas and ratios are derived from the published dimensions; the power ratings are published as a list of five and are not paired to work zones by the catalogue, so the pairing above is an explicit assumption — smallest power with smallest zone, largest with largest.)

The important row is the last one. A 20 m tunnel carries only 7.25 kW for every metre of its length; a 1 m unit carries 21 kW/m. Length is added about ten times faster than power density. That is not an oversight — it reflects the physics: in a long tunnel the load is a thin moving bed, thermal mass passes through quickly, and the heated zones do the work while the cooling and transfer stages take up most of the metres.

It also produces the most common specification error we see. Buyers who need more throughput ask for a longer furnace at the same power. Lengthening the tunnel at fixed power increases dwell time — more soak — but does not increase the heat input the parts receive in the sinter zone. If the process is under-fired, length is the wrong lever; zone power and zone count are the right ones.

Part envelope follows the clearance. A part must pass through the 80 mm or 150 mm opening. So the largest square part that clears the small zone is about 80 × 80 mm and the large zone about 150 × 150 mm — occupying 67% and 63% of the belt cross-section respectively. The belt width looks generous (120 mm, 240 mm) but the height is what rejects the part. Anyone quoting "fits a 240 mm belt" without the clearance is quoting the wrong dimension.

Dwell time is the only thing that sets belt speed

The catalogue publishes zone length. It does not publish belt speed, because belt speed is not a property of the furnace — it is a property of the process you intend to run. Speed follows from dwell:

Required dwellBelt speed, 1 m zoneBelt speed, 20 m zone
30 min

33.3 mm/min

667 mm/min

60 min

16.7 mm/min

333 mm/min

90 min

11.1 mm/min

222 mm/min

120 min

8.3 mm/min

167 mm/min

180 min

5.6 mm/min

111 mm/min

240 min

4.2 mm/min

83 mm/min

360 min

2.8 mm/min

56 mm/min

(Derived: speed = published zone length ÷ dwell. No published belt-speed value exists for this platform and none is claimed.)

Two readings follow. At a 60-minute dwell the 20 m tunnel runs at 333 mm/min — fast enough that the belt and drive become precision items, not accessories. The 1 m unit would need 17 mm/min, slow enough that belt tracking and stalling become the operational risk instead. The same process, on two lengths, fails in two different ways.

Now the throughput arithmetic that turns the table into a quotation check. Parts on a 100 mm pitch in a single lane:

DwellBelt speedParts per hour (1 lane)Parts per hour (2 lanes at 240 mm)Energy per part at 145 kW
60 min

333 mm/min

≈200

≈400

0.73 / 0.36 kWh

120 min

167 mm/min

≈100

≈200

1.45 / 0.73 kWh

240 min

83 mm/min

≈50

≈100

2.90 / 1.45 kWh

(Derived, with the assumptions stated: single-lane and two-lane loading at 100 mm pitch, full power draw throughout, and no idle running. Real energy per part depends on loading density, part mass and the fraction of time the belt is loaded — treat the column as a method, not a promise.)

This is the column to build before comparing a continuous furnace with the batch furnace it is meant to replace. A 600 × 600 × 600 mm batch vacuum furnace in the same catalogue uses 35 kW and about 8–10 kWh per cycle (p.25) over 216 L — roughly 0.037–0.046 kWh per litre per cycle, or 0.162 kW/L. The continuous platform at its largest is 0.20 kW/L over total volume, but 0.60 kW/L over its heated third — about 3.7× the batch figure (derived, assuming equal stage lengths). Continuous furnaces are more power-dense in the zone and less power-dense overall; that is the trade you are buying, and it only pays if the belt stays loaded.

Atmosphere: what "controlled" has to mean

The website publishes the family as "Controlled atmosphere" and, on the product page, as "continuous air atmosphere heat treatment pipeline equipment". The catalogue publishes the mesh-belt platform as nitrogen or mixed gas. Those are not the same envelope, and the difference is a process decision, not a preference.

EnvelopeWhat it protects againstWhat it costsWhere it is the right answer
Air

Nothing — it is the process

Cheapest; simple exhaust

Firing of oxides, glass-to-metal sealing in air, curing

Nitrogen

Oxidation during heat and cool

Gas consumption, curtains at both ends, oxygen monitoring

Copper and brass brazing, stainless sintering, most belt work

Nitrogen + hydrogen (mixed)

Oxide reduction, brighter surfaces

Explosion-proof design, purge interlocks, hydrogen detection

Bright annealing, reduction of stubborn oxides

Endothermic / exothermic gas

Decarburisation control

Generator, gas analysis, safety case

Carbon steels where surface carbon matters

(General engineering envelopes for the atmosphere classes; HuanYu's published options for this platform are nitrogen or mixed gas.)

Two numbers to insist on when the envelope is not air. The first is oxygen at the work zone, in ppm, measured rather than calculated — a nitrogen curtain at the entry is a flow, not a guarantee. The second is dew point. For reference on what tight control looks like in our own catalogue, the HTCC debinding and sintering platform publishes oxygen ≤0.1 ppm and dew point control from −60 to +60 °C (pp.27–28). A tunnel furnace asked to hold a bright surface without a measured dew point is being asked to hold something nobody is measuring.

The third number is the one buyers forget: entry and exit curtain gas flow. The openings at both ends are a permanent leak; a batch furnace is pumped down once, a tunnel is open forever. That makes atmosphere a running cost per hour, and exit oxidation the most common post-commissioning complaint.

Cleanroom class and suspension lines

Two search clusters sit next to the metallurgical tunnel furnace and are often quoted against it.

Class 100 / ISO 5 cleanroom tunnel furnaces. Cleanliness in these machines is an enclosure and airflow problem, not a thermal one. Class 100 (US FED STD 209E, approximately ISO 5) means fewer than 100 particles of ≥0.5 µm per cubic foot — achieved with HEPA filtration, laminar flow across the belt, and positive pressure inside the tunnel relative to the room. The furnace contributes particles through insulation fibre, belt wear and outgassing; the design answer is a sealed muffle, filtered make-up air and a belt-cleaning station. Nothing in HuanYu's published record states a cleanroom class for any platform, so any class claim for our equipment is per project, confirmed in writing. Treat a quoted class without an enclosure drawing as a marketing number.

Suspension conveyor and polymerization tunnels. These run far below metallurgical temperatures — coating cure, powder coat, polymerisation and drying typically fall in the 150–250 °C band (general engineering range). They are long, cheap per metre, and dominated by airflow uniformity rather than element power. A sintering-duty tunnel is the wrong purchase for them even though the words match.

Where our own published record disagrees

Two published HuanYu records describe this family and they do not agree. Naming that is more useful than hiding it, because a buyer will find both.

ItemWebsite (/products/tunnel-furnace-94/)Catalogue (pp.17–24)
Conveyor

Chain belt

Mesh belt

Maximum temperature

800 / 700 °C configurations

1,100 °C

Atmosphere

"Controlled atmosphere"; product text says air atmosphere

Nitrogen or mixed gas

Power

Not published

21 / 30 / 85 / 120 / 145 kW

Work zone

Not published

1,000 × 120 × 80 → 20,000 × 240 × 150 mm

Stage sequence

Not published

Six stages: feed, preheat, sinter, slow cool, water cool, discharge

Model designation

"Published model AC380V"

WDL-100-WX

Three comments, in order of how much they cost a buyer.

The temperature gap of 300–400 °C is the important one, and it is legitimately two machines: a chain belt in air is not a mesh belt in nitrogen. But a buyer reading only the website will size a process to 700–800 °C and then discover the catalogue offers 1,100 °C — or the reverse, and specify a nitrogen envelope the quoted machine does not have.

The category page publishes no usable parameter at all. /products/tunnel-furnaces/ runs about 450 words and contains no power rating, no work-zone dimension, no zone count, no belt width and no throughput, while its four buyer questions are answered with the same sentence each time: that the answer depends on material, workload, atmosphere, temperature and acceptance criteria. That sentence is true and it is not an answer. The page currently absorbs roughly 150 impressions over six months at an average position around 33 with zero clicks — consistent with a page that ranks but gives the searcher nothing to click for.

The model field reads "AC380V", which is a supply voltage, not a model — apparently a template artefact. If you compare model designations across suppliers, ours is unreliable on this page and the catalogue designation (WDL-100-WX) is the one to quote.

None of this changes the engineering. It does mean that any specification you receive for this family should cite a source — catalogue page, drawing, or signed data sheet — rather than a web page.

Continuous or batch: the decision that comes before the model

A tunnel furnace is the right purchase only when the part fits the clearance and the volume keeps the belt loaded. The failure mode of a badly chosen continuous furnace is not a bad part; it is a furnace running empty half the day at full standby power.

CriterionContinuous tunnel winsBatch wins
Part envelope

Fits the 80–150 mm clearance

Larger, taller or heavier than the opening

Volume

Steady, repeatable, hours of loaded belt

Intermittent, job-shop, mixed part mix

Process

One profile, stable for weeks

Many profiles, frequent changeover

Atmosphere

Nitrogen or mixed gas is enough

Vacuum in the 10⁻³ Pa range is required

Temperature

Up to the belt limit (~1,100 °C)

Up to 2,300 °C in graphite hot zones

Labour

Load and unload at two ends, no chamber cycling

Door cycling, fixture handling, per-cycle labour

Energy

Pays back only when loaded

Pays back at any utilisation

For the heavy, large-footprint end of the same decision — parts on trays, loaded by crane — the right comparison is a car-bottom furnace, where the transport and hearth questions are different ones (see our car-bottom guide).

Defect table: ten failures and what they actually mean

SymptomMost likely causeCheck before changing setpoints
Parts cold or under-fired at discharge

Belt speed drifted high; load density increased

Tachometer vs setpoint; parts per metre on the belt

Hardness or density varies along the belt

Zone setpoint OK but zone power saturated

Actual power draw per zone vs rated; element resistance

Discoloration or oxidation at exit

Exit curtain flow low; exit temperature high

Curtain flow meter; part temperature at hand-off

Dew point climbs during the shift

Moisture ingress at entry; insufficient purge after stoppage

Entry humidity; purge time after a stop

Belt stretches and tracks off-centre

Thermal cycling plus uneven load

Tension, drum alignment, load distribution across width

Belt life far below quotation

Belt running above its continuous rating

Belt alloy, actual zone temperature at the belt, not the setpoint

Uniformity poor across belt width

Edge parts see the element, centre parts see each other

Element layout; part loading pattern; edge shielding

Water-cool jacket corrodes

Coolant below the dew point of the atmosphere

Coolant temperature vs measured dew point

Zone controllers oscillate against each other

Cascaded loops not tuned for a moving load

Loop tuning; thermocouple placement relative to the belt

Energy per part rises month on month

Idle running; door and curtain leakage; insulation degradation

Loaded hours vs powered hours; standby current

(This table is general heat-treatment practice for continuous conveyor furnaces, not a HuanYu service specification. Fault isolation on a vacuum batch furnace follows a different sequence — see our troubleshooting guide.)

What to put in the RFQ

Ten items. A supplier who answers all ten has a design; one who answers five has a catalogue.

  1. 01

    Conveyor type and belt alloy, with rated continuous service temperature.

  2. 02

    Total length and heated length, plus the length of each of the six stages.

  3. 03

    Work-zone width and height clearance, and the maximum part envelope in millimetres.

  4. 04

    Zone count, and the power of each zone in kW.

  5. 05

    Atmosphere: gas, flow rate, measured oxygen in ppm and dew point at the work zone.

  6. 06

    Dwell time at the intended belt speed, and the belt-speed range with its tolerance.

  7. 07

    Temperature uniformity across the belt width at the process temperature, with the survey method.

  8. 08

    Cooling: rate, coolant temperature, and the part temperature at discharge.

  9. 09

    Throughput in parts per hour at the stated loading, with the loading assumption written down.

  10. 10

    Acceptance test: what is measured, at what temperature, with what instrument, and by whom.

Frequently asked questions

What is a tunnel furnace?

A continuous conveyor furnace in which parts travel through fixed heated and cooled zones on a belt, chain or roller bed. The part moves continuously; the furnace does not cycle. It is specified by heated length, work-zone clearance and dwell time, not by overall length.

Can a tunnel furnace reach vacuum?

Not in the sense a batch vacuum furnace does. Our continuous platform runs under nitrogen or mixed gas above ambient; the vacuum platforms in the same catalogue reach 6.67 × 10⁻³ Pa to 2 × 10⁻⁴ Pa. A process needing 10⁻³ Pa needs a chamber or a load-lock.

What is the maximum part size?

It follows the clearance, not the belt width. On the published platform the clearance is 80 mm at the small end and 150 mm at the large end, so the largest square part that passes is about 80 × 80 mm or 150 × 150 mm.

Why does the website say 700 / 800 °C when the catalogue says 1,100 °C?

Because they describe two different belts in two different atmospheres — a chain belt in air (website) and a mesh belt in nitrogen or mixed gas (catalogue). Both are HuanYu records; neither is a misprint. Ask which configuration is being quoted.

How long should the heated zone be?

Long enough to deliver the soak your metallurgy needs at a belt speed your throughput requires. Two of the six stages are heated; if the stages were equal that would be 33% of total length. Ask for the heated length in metres and check it against your dwell time.

Why does power per metre fall as the furnace gets longer?

Because length and power do not scale together: across the published range, length grows 20× and power 6.9×. A 20 m tunnel carries 7.25 kW/m; a 1 m unit carries 21 kW/m. Long tunnels gain dwell, not heat input per metre.

What atmosphere should I specify?

Air if the process tolerates it, nitrogen for most brazing and stainless sintering, and nitrogen with hydrogen only with a proper safety case. Specify measured oxygen in ppm and dew point, not "controlled atmosphere".

Can you supply a class 100 cleanroom tunnel?

Cleanliness is an enclosure and airflow design, not a standard option. No HuanYu published record states a class for this platform, so it is confirmed per project with an enclosure drawing — treat a class claim without one as unverified.

How do I compare a tunnel furnace quote with my batch furnace?

Convert both to kWh per part at your real loading. A batch cycle on our 216 L platform uses about 8–10 kWh; a loaded continuous line at 145 kW and 200 parts per hour works out near 0.73 kWh per part on a single lane. The comparison only means something once the parts-per-hour figure is stated.

Need help applying this?

Bring the guide into a real equipment conversation.

Discuss your process